Licensed building contractor · CBC0000000
Anybody can show you a finished room. What decides whether you would do it again is whether the schedule was real, the price held, and somebody answered the phone in week six.
Book a walkthroughWhat it costs
Kitchen remodeling
Cabinets, counters, electrical and the two weeks nobody warns you about.
Read more →Bathroom remodeling
Waterproofing done properly, which is the half you will never see.
Read more →Additions and structural work
Permitted, engineered, and inspected — in your name, in that order.
Read more →Flooring and interior carpentry
Trim, built-ins and the doors that never quite closed.
Outdoor kitchens and covered patios
The one addition that does not need a bathroom added to it.
A walkthrough, free
An hour in the room, measuring, and a conversation about what you actually use it for.
A written scope
Fixtures named, allowances as numbers, and what happens behind a wall we have not opened.
A schedule, on paper
Week by week, with the delivery dates that drive it, so a slip is visible rather than explained.
One person, the whole way
The same site lead from demolition to the final walk. You have their number.
A punch list you write
We do not sign it off. You do, and we invoice after.
They put a temporary kitchen in the garage on the first day. Nobody else had even mentioned it, and by week six it was the thing I would have paid extra for.
The wall had a surprise in it. They photographed it, priced it that afternoon against the number already in the contract, and the finish date did not move.
I asked three builders why their start dates were so different. Only one of them explained it, and the explanation turned out to be the reason they finished first.
Palm Beach County
- Boca Raton
- Delray Beach
- Boynton Beach
- Highland Beach
- Wellington
Broward County
- Fort Lauderdale
- Parkland
- Coral Springs
- Deerfield Beach
What a room actually costs here.
Ranges, not quotes — every one of these moves with the fixtures you pick and what is behind the wall. The written quote is fixed before work starts, with allowances stated as numbers rather than hidden in a word.
- Kitchen, mid-range
- $38,000–$65,000
- Kitchen, layout moved
- $65,000–$110,000
- Bathroom, hall or guest
- $18,000–$32,000
- Primary bathroom
- $32,000–$70,000
- Addition, per square foot
- $280–$420
- Walkthrough and written scope
- No charge